The project, high 220 kV highest transmission tower in Ningxia, overcame many difficulties during construction. It spans a total of 38 high-speed and Baolan railways, with concentrated crossing points, high construction risks and difficult control.
The UHV channel project starts at the Zhangbei 1000kV substation and ends at the Shengli 1000kV substation in Inner Mongolia, and will build a 1000kV double-circuit line with a total length of 140 kilometers. Zhang Bei to victory in uhv engineering i...
It is implementing the wiring operation of the new 110 kV Chu-lao transmission line, accelerating the pace of project construction, improving the grid structure, and helping the high-quality development of local economy and society.
Communication towers for high-speed railways play a crucial role in ensuring the smooth operation and safety of train services。These towers are primarily used for the transmission and reception of wireless signals, which are essential for various asp...
To serve the construction of a new type of power system and contribute to achieving the "dual carbon" goals, and to build more digital, intelligent, green, low-carbon, safe and reliable power transmission and transformation projects, the construction...
The 750-kilovolt line project involves complex crossing and overpass scenarios, with tall and heavy iron towers. There are 18 iron towers with a total height exceeding 100 meters. To ensure the safe crossing of the 750kV Xingzhou I and II lines, the ...
Xinyuan iron tower group which established in 1994, is one leading manufacture in the telecommunication tower,transmission tower and other types of steel towers.
Explore moreThe group includes two main factory plants,one plant covers an area of 60,000 square meters is mainly the production workshop of the iron tower, with an annual production capacity of more than 70,000 tons; another one covers an area of 60000 square meters mainly for the galvanizing workshop, divided into three phases of construction, a total investment of 720 million yuan. Designed annual production capacity of 300,000 tons; The old factory covers an area of 30,000 square meters and mainly produces communication computer rooms with an annual production capacity of more than 4,000. Engineering construction, maintenance capacity of more than 16,000 base stations, the existing staff of 695 people.